Shri Bajrang Power & Ispat Ltd., Raipur
| PROJECT NAME | 18MW Captive power plant |
| PLANT CONFIGURATION | 2x38tph WHRB; 2x350 tpd sponge iron |
| SCOPE OF SERVICES | Engineering & Consultancy Services |
Alok Ferro Alloys Ltd., Raipur
| PROJECT NAME | 8MW Captive power plant |
| PLANT CONFIGURATION | 38tph AFBC boiler ; Ferro alloy furnaces |
| SCOPE OF SERVICES | Engineering & Consultancy Services |
Indsil Electrosmelts Ltd., Raipur
| PROJECT NAME | 12MW Captive power plant |
| PLANT CONFIGURATION | 50 tph AFBC boiler ; Ferro alloy furnaces |
| SCOPE OF SERVICES | Engineering & Consultancy Services |
Shree Nakoda Ispat Ltd., Raipur
| PROJECT NAME | 6MW Captive power plant |
| PLANT CONFIGURATION | 1x26tph WHRB ; 1x200 tpd sponge iron |
| SCOPE OF SERVICES | Engineering & Consultancy Services |
Real Ispat Ltd., Raipur
| PROJECT NAME | 15MW Captive power plant |
| PLANT CONFIGURATION | 2x10tph WHRB and 35 tph AFBC ; 2x100 tpd sponge iron |
| SCOPE OF SERVICES | Engineering & Consultancy Services |
API Ispat & Powertech Ltd., Raipur
| PROJECT NAME | 15MW Captive power plant |
| PLANT CONFIGURATION | 1x38tph WHRB and 45 tph AFBC ; 1x350 tpd sponge iron |
| SCOPE OF SERVICES | Engineering & Consultancy Services |
V.K.G. Steel & Power Ltd., Uttiramerur, Tamil Nadu
| PROJECT NAME | 8MW Captive power plant |
| PLANT CONFIGURATION | 2x10tph WHRB and 25tph AFBC ; 2x100 tpd sponge iron |
| SCOPE OF SERVICES | Engineering & Consultancy Services |
Kanishk Steel Industries Ltd., Gummidipoondi, Tamil Nadu
| PROJECT NAME | 10MW Captive power plant |
| PLANT CONFIGURATION | 2x10tph WHRB and 25tph AFBC ; 2x100 tpd sponge iron |
| SCOPE OF SERVICES | Engineering & Consultancy Services |
Kamachi Sponge & Power Ltd., Gummidipoondi, Tamil Nadu
| PROJECT NAME | 10MW Captive power plant |
| PLANT CONFIGURATION | 4x10tph WHRB ; 4x100 tpd sponge iron |
| SCOPE OF SERVICES | Engineering & Consultancy Services |
Topworth Steels Ltd., Dhurg, Chastisgarh
| PROJECT NAME | 20MW Captive Power plant |
| PLANT CONFIGURATION | 2x10tph WHRB, 1x38tph WHRB and 1x40tph AFBC; 2x100 tpd + 1x350 tpd sponge iron plant |
| SCOPE OF SERVICES |
Shree Sidhbali Ispat Ltd.
| PROJECT NAME | 15MW Captive Power Plant |
| PLANT CONFIGURATION | 75 tph CFBC Boiler, 67 ata / 515°C; 3x100 tpd |
| SCOPE OF SERVICES | Engineering & Consultancy Services |
Viranga Steels Pvt. Ltd.
| PROJECT NAME | 30MW Captive Power Plant |
| PLANT CONFIGURATION | 2 x 70tph AFBC, 2X10tph WHRB 66 / 490±5°C; 2x100 tpd |
| SCOPE OF SERVICES | Engineering & Consultancy Services |
Drolia Electro steels, Raipur
| PROJECT NAME | 12MW Captive Power Plant |
| PLANT CONFIGURATION | 2 x 10tph WHRB, 1 x 35tph AFBC 67 / 490°C; 2x100 tpd |
| SCOPE OF SERVICES | Engineering & Consultancy Services |
Alok Ferro Alloys Ltd., Raipur
| PROJECT NAME | 8MW Captive Power Plant |
| PLANT CONFIGURATION | 38tph AFBC boiler ; Ferro alloy furnaces |
| SCOPE OF SERVICES | Engineering & Consultancy Services |
IndsilElectrosmelts Ltd., Raipur
| PROJECT NAME | 12MW Captive Power Plant |
| PLANT CONFIGURATION | 50 tph AFBC boiler ; Ferro alloy furnaces |
| SCOPE OF SERVICES | Engineering & Consultancy Services |
Shree Nakoda Ispat Ltd., Raipur
| PROJECT NAME | 6MW Captive Power Plant |
| PLANT CONFIGURATION | 1x26tph WHRB ;1x200 tpd sponge iron |
| SCOPE OF SERVICES | Engineering & Consultancy Services |
Real Ispat Ltd., Raipur
| PROJECT NAME | 15MW Captive Power Plant |
| PLANT CONFIGURATION | 2x10tph WHRB and 35 tph AFBC ; 2x100 tpd sponge iron |
| SCOPE OF SERVICES | Engineering & Consultancy Services |
API Ispat & Powertech Ltd., Raipur
| PROJECT NAME | 15MW Captive Power Plant |
| PLANT CONFIGURATION | 1x38tph WHRB and 45 tph AFBC ; 1x350 tpd sponge iron |
| SCOPE OF SERVICES | Engineering & Consultancy Services |
V.K.G. Steel & Power Ltd., Uttiramerur, Tamil Nadu
| PROJECT NAME | 8MW Captive Power Plant |
| PLANT CONFIGURATION | 2x10tph WHRB and 25tph AFBC ; 2x100 tpd sponge iron |
| SCOPE OF SERVICES | Engineering & Consultancy Services |
Kanishk Steel Industries Ltd., Gummidipoondi, Tamil Nadu
| PROJECT NAME | 10MW Captive Power Plant |
| PLANT CONFIGURATION | 2x10tph WHRB and 25tph AFBC ; 2x100 tpd sponge iron |
| SCOPE OF SERVICES | Engineering & Consultancy Services |
Kamachi Sponge & Power Ltd., Gummidipoondi, Tamil Nadu
| PROJECT NAME | 10MW Captive Power Plant |
| PLANT CONFIGURATION | 4x10tph WHRB ; 4x100 tpd sponge iron |
| SCOPE OF SERVICES | Engineering & Consultancy Services |
Topworth Steels Ltd., Dhurg, Chastisgarh
| PROJECT NAME | 20MW Captive Power Plant |
| PLANT CONFIGURATION | 2x10tph WHRB, 1x38tph WHRB and 1x40tph AFBC; 2x100 tpd + 1x350 tpd sponge iron plant |
| SCOPE OF SERVICES | Consultancy, Detailed Engineering and Procurement Engineering |
Shree Sidhbali Ispat Ltd
| PROJECT NAME | 15MW Captive Power Plant |
| PLANT CONFIGURATION | 75 tphCFBC Boiler,67 ata / 515°C; 3x100 tpd |
| SCOPE OF SERVICES | Engineering & Consultancy Services |
Viranga Steels Pvt. Ltd.
| PROJECT NAME | 30MW Captive Power Plant |
| PLANT CONFIGURATION | 2 x 70tph AFBC, 2X10tph WHRB 66 / 490±5°C; 2x100 tpd |
| SCOPE OF SERVICES | Engineering & Consultancy Services |
Drolia Electro steels, Raipur
| PROJECT NAME | 12MW Captive Power Plant |
| PLANT CONFIGURATION | 2 x 10tph WHRB, 1 x 35tph AFBC 67 / 490°C; 2x100 tpd |
| SCOPE OF SERVICES | Engineering & Consultancy Services |
TCP Limited., Gummidipoondi Chennai
| PROJECT NAME | 63MW Coal Based Power Plant |
| PLANT CONFIGURATION | 275 tph PC fired boiler with 1x63MW STG and Air cooled condenser |
| SCOPE OF SERVICES | Engineering & Consultancy Services |
OPG Energy Private Ltd., Gummidipoondi
| PROJECT NAME | 80MW Coal Based Power Plant |
| PLANT CONFIGURATION | 320 tph PC fired boiler with 1x80MW STG and Air cooled condenser |
| SCOPE OF SERVICES | Engineering & Consultancy Services |
Ind Barath Powergencom, Thoothukudi
| PROJECT NAME | 3x63MW Coal Based Power Plant |
| PLANT CONFIGURATION | 3x275 tph CFBC boilers with 3x63MW STG and air cooled condenser |
| SCOPE OF SERVICES | Engineering & Consultancy Services |
OPG Energy Private Ltd., Gummidipoondi
| PROJECT NAME | 80MW Coal Based Power Plant – Unit 2 |
| PLANT CONFIGURATION | 320 tph PC fired boiler with 1x80MW STG and Air cooled condenser |
| SCOPE OF SERVICES | Engineering & Consultancy Services |
Kamachi Sponge and Power Ltd., Gummidipoondi
| PROJECT NAME | 2x35MW Coal Based Power Plant |
| PLANT CONFIGURATION | 2x150tph CFBC boiler with 2x35MW turbine and ACC |
| SCOPE OF SERVICES | Owner’s Engineering Services |
OPG Energy Private Ltd., Gummidipoondi
| PROJECT NAME | 80MW Coal Based Power Plant – Unit 3 |
| PLANT CONFIGURATION | 320tph PC fired boiler with 1x80MW STG and Air cooled condenser |
| SCOPE OF SERVICES | Engineering & Consultancy Services |
Ind Barath Thermal Ltd., Thoothukudi
| PROJECT NAME | 2x150MW Coal Based Power Plant |
| PLANT CONFIGURATION | 2x480tph CFBC boilers with 2x150MW STG and ACC |
| SCOPE OF SERVICES | Engineering & Consultancy Services |
Shree Virangana Steels Ltd.,
| PROJECT NAME | 2x35MW Captive Power Plant |
| PLANT CONFIGURATION | 2x80tph AFBC, 66/495°C |
| SCOPE OF SERVICES | Engineering & Consultancy Services |
Crest Steel & Power Ltd.,
| PROJECT NAME | 2x35MW Captive Power Plant |
| PLANT CONFIGURATION | 2 x 38 tph WHRB, 66 / 495°C; 3x350tpd kilns |
| SCOPE OF SERVICES | Engineering & Consultancy Services |
Suryadev Alloy & Power Private Limited
| PROJECT NAME | 2x80MW Coal Based Power Plant |
| PLANT CONFIGURATION | 2x320 tph CFBC boiler at 96 ata; 540±5°C;2 x 80MW bleed cum condensing turbine. |
| SCOPE OF SERVICES | Engineering & Consultancy Services |
KVK Nagai Power Ltd.,
| PROJECT NAME | 1x150MW Coal Based Power Plant |
| PLANT CONFIGURATION | 480 tph PC fired boiler with 1x150MW STG and Air cooled condenser |
| SCOPE OF SERVICES | Engineering & Consultancy Services |
OPG Energy Gujarat Ltd., Bhadreshwar
| PROJECT NAME | 2x150MW Coal Based Power Plant |
| PLANT CONFIGURATION | 2x500 tph PC fired boiler and 2x150MW steam turbine with air cooled condenser |
| SCOPE OF SERVICES | Engineering & Consultancy Services |
ARS Steels & Power Ltd., Gummidipoondi
| PROJECT NAME | 60MW Coal based powerplant |
| PLANT CONFIGURATION | 1x240tph CFBC boiler with 60MW STG and ACC |
| SCOPE OF SERVICES | Engineering & Consultancy Services |