| 12 February 2014 | 20MW Cogeneration Power plant at Dr.D.Y.PATIL, Kolhapur was synchronized. |
| 30 January 2014 | 1X30MW Coal Based Power Plant at ACB (INDIA) PVT LTD, Chakabura was synchronized. |
| 25 December 2013 | 8MW Power plant at SHIVALAY ISPAT, Raipur was synchronized. |
| 21 November 2013 | 2nd Unit of Ind Barath Thoothukkudi, 2X150MW Thermal Power Plant was synchronized. |
| 13 August 2013 | 2nd Unit of Suryadev Gummidipoondi, 2X80MW was synchronized. |
| 30 July 2013 | 60MW Power plant at ARS Power Ltd., Gummidipoondi was synchronized. |
| 13 June 2013 | 2x35MW at Tulsyan NEC, Gummidipoondi was synchronized. |
| 31 May 2013 | 3rd unit of OPG Gummidipoondi, 80MW power plant, was synchronized. |
| 22 May 2013 | 2x45MW at SBQ steel Gudur – 1st Unit was synchronized. |
| 01 April 2013 | 1st Unit of Suryadev Gummidipoondi, 2X80MW was synchronized. |
| 18 December 2012 | 1st Unit of Ind Barath Thoothukkudi, 2X150MW Thermal Power Plant was synchronized. |